Glass Forever – JCoffey: Fresh Wharf

gf solid green 2025

JCoffey is focused on finding innovative ways to meet its clients’ sustainability targets, by maximising on-site, waste management efficiencies. Experts in construction and deconstruction, they are committed to diverting 100% of building material waste away from landfill.

The JCoffey deconstruction teams always breakdown the components of a building, segregating the waste to ensure 100% is diverted away from landfill and recycled when possible.

Fresh Wharf, located on the Thames, London, is an 11-storey building that is being retrofitted to designs by Buckley Gray Yeoman. JCoffey is deconstructing and making structural alterations to the building, on behalf of Mace.

Chris Wellgreen, Sustainability, carbon and systems manager at JCoffey Construction said: “Partnering with Saint-Gobain Glass has enabled a more specific approach to the recycling of end-of-life glass into new, high-performance flat glass that can help to create more sustainable buildings.

“JCoffey has helped setup and refine the Glass Forever, flat glass recycling programme. A lot of time and effort goes into planning the extraction of the glass, working with project stakeholders, way before any glass is removed from the building.

“We need to ensure the glass is of an appropriate quality and what segregation is required, and we need to confirm the most efficient way of breaking down the glass

“We do it because it is better for our clients and we can do it in an efficient way that doesn’t affect the programme.”

The glass has been removed and cut down into manageable sections by the JCoffey deconstruction team. It was then placed on a safe breaking table to be broken into smaller pieces that are collected in Saint-Gobain’s glass cullet bags. The JCoffey team ensures the cullet is free of contaminants before Saint-Gobain Glass collects the cullet using a euroliner, to be returned for remelting in the furnace.

JCoffey working with the design team, including BGY and Ramboll, collaborated with Saint-Gobain to ensure the exterior glazing and interior partitions were suitable for the Saint-Gobain Glass Forever programme.

Other case studies you might like

McLaren Getjar deconstruction cullet
the macallan distillery 059 banner
Spring Gardens facade
img 3293
img 0285
img 3309

Glass Forever – McLaren Construction: A Circular Economy

McLaren has worked with Getjar, a specialist, construction company, to recover the post-consumer glass from a project in London that was undergoing refurbishment. The project is an excellent example of a circular economy for glass, as the glass taken from the building will be remanufactured by Saint-Gobain Glass into new, high-performance, flat glass, products. When complete, the refurbished building will be a net-zero building.

keltbray one victoria street

Glass Forever – Keltbray: One Victoria Street

Keltbray is a UK, specialist construction, engineering services business, offering a uniquely integrated delivery capability, spanning key phases of the client value chain – design management, civil engineering, geotechnical, construction…
glass forever
KpH Demolition
KpH Demolition

Glass Forever – KpH: It’s a Smashing Success

Building on the triumph of our initial collaboration, we are proud to announce another successful partnership with KpH, a leading name in Deconstruction Solutions and Environmental Services. Together, we have completed yet another outstanding Glass Forever recovery project in the heart of Central London. Glass Forever is our circular economy approach to sustainability, and for our post-consumer customers, we’re developing numerous glass recovery models that are simple, effective, and meticulous in approach to ensure optimal output for the clients and Saint-Gobain Glass.