Glass Forever – JCoffey: Fresh Wharf

gf solid green 2025

JCoffey is focused on finding innovative ways to meet its clients’ sustainability targets, by maximising on-site, waste management efficiencies. Experts in construction and deconstruction, they are committed to diverting 100% of building material waste away from landfill.

The JCoffey deconstruction teams always breakdown the components of a building, segregating the waste to ensure 100% is diverted away from landfill and recycled when possible.

Fresh Wharf, located on the Thames, London, is an 11-storey building that is being retrofitted to designs by Buckley Gray Yeoman. JCoffey is deconstructing and making structural alterations to the building, on behalf of Mace.

Chris Wellgreen, Sustainability, carbon and systems manager at JCoffey Construction said: “Partnering with Saint-Gobain Glass has enabled a more specific approach to the recycling of end-of-life glass into new, high-performance flat glass that can help to create more sustainable buildings.

“JCoffey has helped setup and refine the Glass Forever, flat glass recycling programme. A lot of time and effort goes into planning the extraction of the glass, working with project stakeholders, way before any glass is removed from the building.

“We need to ensure the glass is of an appropriate quality and what segregation is required, and we need to confirm the most efficient way of breaking down the glass

“We do it because it is better for our clients and we can do it in an efficient way that doesn’t affect the programme.”

The glass has been removed and cut down into manageable sections by the JCoffey deconstruction team. It was then placed on a safe breaking table to be broken into smaller pieces that are collected in Saint-Gobain’s glass cullet bags. The JCoffey team ensures the cullet is free of contaminants before Saint-Gobain Glass collects the cullet using a euroliner, to be returned for remelting in the furnace.

JCoffey working with the design team, including BGY and Ramboll, collaborated with Saint-Gobain to ensure the exterior glazing and interior partitions were suitable for the Saint-Gobain Glass Forever programme.

Other case studies you might like

cool lite xtreme
4 angel square manchester 035
4 angel square manchester 012

Angel Square, Manchester

NOMA is a major 20-acre urban regeneration project in the heart of Manchester city centre. The master plan aims to create a vibrant mixed-use neighbourhood with new homes, offices, hotels, shops, restaurants, and public spaces. When fully completed, NOMA will comprise 2.5 million sq. ft. of office space, 1 million sq. ft. of residential units, and 200,000 sq. ft. of hotels, making it one of the most significant regeneration schemes in the UK.

img 5182
img 5190
img 6691

Glass Forever – General Demolition: Building a Sustainable Future

Established in the mid-1970s, General Demolition provides deconstruction and enabling works across London and the home counties. The company’s expertise encompasses strip-out, cut-and-carve, and total demolition works in and around central London. With a recycling heritage exceeding 30 years, notably at their Walton on Thames site, General Demolition is richly poised for continued growth, having achieved an increased turnover of £15 million in 2024.

glass forever
KpH - breaking glass into bag
KpH - breaking glass into bag
KpH - breaking glass into bags 2
KpH - deglazed frames
KpH Demolition - cullet return

Glass Forever – KpH: Pioneering Deconstruction Solutions

The KpH Group, industry leader in Deconstruction Solutions and Environmental Services, approached the Saint-Gobain Glass specialist Sustainability Team in 2023 with an interest in joining our flagship glass recycling and sustainability initiative. Partnering with Saint-Gobain Glass, KpH received expert guidance as it began its journey towards glass sustainability with a high-profile deconstruction project in central London.