Glass Forever – General Demolition: Building a Sustainable Future

gf solid green 2025

Planning For Tomorrow, Today

Established in the mid-1970s, General Demolition provides deconstruction and enabling works across London and the home counties. The company’s expertise encompasses strip-out, cut-and-carve, and total demolition works in and around central London. With a recycling heritage exceeding 30 years, notably at their Walton on Thames site, General Demolition is richly poised for continued growth, having achieved an increased turnover of £15 million in 2024.

Since George Stainton became Managing Director in 2021, his ambitious leadership has driven the company to flourish. Demonstrating a powerful drive for growth, General Demolition has created new roles and opportunities, laying the foundations for future expansion centred on values of responsible and sustainable demolition practices.

Sharing a commitment to sustainable construction and glazing solutions, General Demolition was approached by the Glass Forever team at Saint-Gobain Glass with a proactive glass recovery proposal. George Stainton, Managing Director of General Demolition, praised David Entwistle, Director of Major Projects, and Richard Calcutt, Technical Project Manager at Saint-Gobain Glass:

“What’s refreshing about Saint-Gobain Glass is that they approached us with a proven solution, and importantly for us, it aligned with our sustainability ethics and was efficient to implement at 21 Glass House Street, Soho, London. At General Demolition, we’ve always placed sustainable practice at the core of our activities. We view the materials on our sites not as waste products, but as opportunities to contribute to the circular economy. Partnering with Saint-Gobain Glass and the Glass Forever Programme was a natural extension of our work, and most importantly, it works!”

Learnings and Planning Ahead

For this project, we utilised a trusted methodology involving a custom-built table for safely breaking the glass, ensuring it remained free of contaminants before packing it into the Saint-Gobain Glass custom one-tonne cullet collection bags. Using this process, we successfully recovered both laminated and toughened interior glass, as well as all secondary glazing.

Due to site access constraints in Soho, we adapted the glass recovery model to use Hiab vehicles for cullet collection. The collected glass was transported to a Glassolutions site in Thurrock, ultimately delivering a total of 36 tonnes to the plant in Eggborough for re-manufacturing into new high-performance flat glass products.

From initial conversations to final implementation, the complexity of glass recycling was embraced as a positive opportunity by General Demolition. Commenting on the process, George Stainton said, “The primary takeaway is the importance of early engagement with programmes like Glass Forever. The key to successfully completing deconstruction projects is understanding the nuances and logistics of each site and its challenges. With the knowledge we have today, General Demolition is better placed to approach upcoming projects with a timeframe for glass recovery built into our planned works, this not only suits our existing operational methods but also the requirements of the Glass Forever programme.”

Regarding the project’s overall success, Richard Calcutt praised the General Demolition team, “There’s a real positive and proactive energy within the General Demolition team. Their collaborative spirit shone throughout the process, as the team eagerly learned and adapted. They understood the implicit value of Glass Forever, making the adoption and roll-out across the site seamless. George and the GD management team played a pivotal role in ensuring everyone directly involved in the project were positively engaged, and this unified approach led to the successful delivery of glass on the project. Both teams should be very proud of their accomplishments.”

Other case studies you might like

water house square glass recycling
water house square glass recycling
water house square glass recycling
water house square glass recycling

Glass Forever – Salter Demolition: Glass Recycling Excellence

Seeking to enhance their existing repurpose and recycling approach to sustainability, the team at Salter approached Saint-Gobain Glass with a keen interest in participating in the Glass Forever Programme for the historic Waterhouse building in Central London. With the support of the client M&G, Salter Demolition enthusiastically embraced the opportunity to actively engage in the programme, identifying Saint-Gobain Glass as the ideal proactive partner.

whitworth gallery manchester 042
whitworth gallery manchester 049
whitworth gallery manchester 009
whitworth gallery manchester 015
whitworth gallery manchester 019
whitworth gallery manchester 048

The Whitworth Gallery

Nestled within the serene Whitworth Park and proudly affiliated with the esteemed University of Manchester, The Whitworth stands as a distinguished art gallery, boasting an impressive collection of approximately 55,000 pieces. The £15 million development was awarded Building of the Year prize in the RIBA North West Regional Awards and RIBA National Award.

Erith
1
img 2217

Glass Forever – Erith: Enabling Sustainable Services

With over 50 years of providing sustainable enabling services, Erith stands as a prominent contractor specialising in turnkey solutions for clients across the UK. The alignment of Erith’s five-year strategic plan and daily activities with the UN Sustainable Development Goals underpins their commitment to innovation and positive interventions to achieve sustainable development